These four projects are vital to the continued reliability of our water supply and treatment process. It replaces the 60 year-old raw water intake on Cross Lake and the two main transmission mains that leave the Amiss plant. It also replaces several dozen valves within the Amiss plant that are critical to isolating pumps and equipment for maintenance and rehabilitates the historic Hi/Lo building, which houses pumps and process equipment.